The road between Ponte a Serraglio and Fornoli is open! The repair happened amazingly quickly.


The walking bridge is open again too.
Well done to all involved in the repair.
Part of the footpath in Ponte a Serraglio has fallen into the river.
The footpath is now closed, along with the pedestrian bridge. The road between the Granaiola turnoff and the bridge at Ponte a Serraglio is also closed to traffic, but open to pedestrians.
This is obviously going to cause traffic problems. Let’s hope work, which should start soon, will not take too long.